Power System Analysis - Part 2

E-mail Print PDF

In any project, doing a simple short circuit verification and load flow analysis will save the electrical engineer headaches during testing, commissioning and system reliability testing of the project.

I know some electrical engineers who don't even bother doing a manual calculation because they assume that what they have experienced in their past projects will be the same as their current. This is totally wrong. Every project, despite having similarities have different electrical parameters. Making assumptions and not verifying it mathematically is totally unacceptable.

One reasoning for this may be, I can't do manual calculation, the project is too complex or I don't have the tools to do system analysis, etc. Again, these are just alibis for not doing what is a very important aspect in electrical design.

I have now tried using InterPSS. My first impression,it is very versatile and simple. When I have seen the icons, I ask myself, where are the utility, transformer, feeder, motor icons, etc. But as I started using it, I came to know that the few icons appearing in the tool bar can simlulate several equipment.

The results are actually comparable to ETAP. If you have started using this power system analysis software, you may not even bother looking at the very expensive commercial softwares again.

The only limitation I found is that the IEC Standard short circuit calculation is not yet available. Using the generic one will suffice however. I have not tried using motor starting analysis but I knew that it will be probably as easy as changing the values of the motors with their starting parameter values. This is just a personal opinion though. I have not actually done it. I will share it once I get the right answer.

Screen captures and some explanation of a simple calculation that I made using the InterPSS could be found at the download section.

Some higlights of the calculation are:

  • Supply
    33KV, X/R = 7, MVAsc = 2000
  • Transformers
    1.5MVA, 33KV/11KV
    500KVA, 11KV/415V
  • Motors
    800kW, 11KV
    300kW, 415V

 

Our Ads

Our Sponsors

Design Stages

Successful projects were not developed overnight. They have undergone through several stages. Missing any one stage may have caused disastrous effect on the projects causing failure.

Conceptual Design
To develop your project ideas into a more tangible perspective.
Front End Engineering and Design (FEED)
To explore possibilities to enable better control on the outcome of ideas, getting the final result without delay but more importantly without overshooting your budget.
All ideas need to be developed at this stage of the project.
Detail Design
The final stage of the design aspect of your project. Only minor, unforeseen and uncontrollable by the project team need to be implemented at this stage.
Injecting radical changes at this stage could mean redevelopment of the project concepts leading to project delays and budget overshoot.

We could offer the Electrical Engineering aspect of your project ideas. If you want to seek our help, contact us at HELP@FILIPINOENGINEER.


Statistics

Members : 174
Content : 62
Web Links : 7
Content View Hits : 28866
New Members:
  • Renata
  • Roomma
  • valeriaspinoza
  • skIpsyEpics
  • amateurteens

Spammers:

schoooler
schoooler@gmail.com
2009-01-02 16:06:45
IvanPoddubniy
corkconry@gmail.com
2009-01-01 02:16:24
AssolBRT
assolbrt@gmail.com
2008-12-30 07:27:01
OnekRamma
ownerouttrurb@gmail.com
2008-12-29 15:49:37
PafInvatt
olfdfdvbb3@gawab.com
2008-12-26 19:12:52
kitesurftrips
kite_surf@mail.ru
2008-12-26 07:22:08
KigeReokSeemPek
maxbizmax-fax@yahoo.co.uk
2008-12-25 16:57:35
NickelbackK
nickelback00ei@gmail.com
2008-12-25 15:46:50
MileniaMcAdams
mileniamcad@mail.ru
2008-12-25 06:08:08

Due to the increase in spam registration, new users should validate their registration to be removed from the Spammers List Thank you!

Tag Cloud

atmosphere   cable   calculation   chapter   circuit   electrical   equipment   explosive   factor   fault   flammable   impedance   into   lightning   load   normal   protection   release   requirements   safety   source   standard   standards   systems   used   voltage  

Created with AkoCloud.

Who's Online

We have 17 guests online

Mission

To provide a knowledge base and tools for Filipinos to prepare them with the demands of the global job market.


Newsflash

Our mission: To create a knowledge base for Filipino Electrical Engineers, other engineering disciplines and students to enable them to cope with the demands of the world job market. Yes, we can!

Recent Post